Field Report: EIFS Column Install in Livonia

DISPATCHED: April 1, 2026

Phase 1: Analysis (Before)

Field report eifs column install in livonia before 1

EIFS stucco will be applied to the columns at Mastercraft Jewelers.

Phase 2: Restoration (During)

Field report eifs column install in livonia during 1

The bottom EIFS section, a direct-applied system, was installed over cement board. Waterproofing was completed. EIFS foam was adhered with v-grooves to match the upper EIFS profile.

Phase 3: Completed (After)

Field report eifs column install in livonia after 1

How fitting is it that we put together this masterpiece for Mastercraft Jewelers.

The columns at Mastercraft Jewelers were slated for a significant update. The project's initial assessment determined the need for new EIFS stucco. The primary goal was to ensure this new application would match the existing upper stucco as closely as possible, creating a unified appearance across the building.

Work commenced by applying a specialized material to the bottom portions of the columns, situated over a robust cement board. This crucial step completely sealed the area, providing comprehensive protection against water. Next, foam boards were carefully attached. These boards had V-shaped grooves carved into them, and their strategic placement was designed to make the lower wall sections mirror the intricate design of the wall's upper part.

The completed columns at Mastercraft Jewelers stand as a testament to craftsmanship. The new EIFS stucco successfully achieved the desired match with the existing structure, enhancing the building's overall aesthetic and contributing to its long-term durability. The client expressed great satisfaction with the masterful transformation.