EIFS Termination at Parapet Specification

EIFS Termination at Parapet Specification

An overview of the EIFS Termination at Parapet Specification

In this post we are going to talk about the EIFS Termination at Parapet Specification. I have been doing EIFS for a long time and when we are out on repairs it seems like this is one of those things that is almost never done correctly. The proper way to terminate a parapet is to apply Dryvit’s Aqua Flash over the entire top of the parapet and down both sides at least 2″. Read more EIFS Termination at Parapet Specification